Typical Lead Time for Sheet Metal Fabrication Orders

What affects lead time, from prototype to mass production. How to plan your schedule.

One of the first questions buyers ask: how long does sheet metal fabrication take? The answer depends on order type

For rapid prototypes (1-20 pcs), expect 3-5 working days

This is laser cut + CNC bend, no tooling

For low volume production (50-500 pcs), plan 15-20 days

This includes material preparation, production, surface treatment and packing

For high volume (1000+ pcs), plan 30-45 days

If progressive dies are needed, add 2-3 weeks for tooling

What affects lead time? Material availability (SS304 and aluminum are usually in stock), surface treatment (powder coating is fast, anodizing takes longer), and quantity

Tips to speed up: provide complete drawings (PDF + DXF/STEP), confirm material and finish upfront, allow air freight for urgent orders

At Yiguangnian, we quote lead time on every RFQ and communicate proactively if delays happen.